|
You are here |
phil.lavin.me.uk | ||
| | | | |
www.pololu.com
|
|
| | | | | This is the fourth post in a series documenting the installation and first year of operation of Pololu's 305kW solar array. Here are the previous posts: Part 1: background starting in late 2022 and how we committed to the $650,000 project by the beginning of January 2023, with a target completion date of May 31, 2023. Part 2: installation from January 2023 through first day of operation on October 5, 2023. Part 3: System failures and production results during the first year of operation. In this post, we will look at how our solar installation affected our electricity bills. Because operations were so dramatically altered by the pandemic starting in 2020, we have to go back to 2019 for the best baseline for electricity consumption and cost. To maximize the s... | |
| | | | |
www.modularcircuits.com
|
|
| | | | | ||
| | | | |
www.how-to-wire-it.com
|
|
| | | | | How to wire a thermostat, thermostat wiring color codes and wiring diagrams. | |
| | | | |
itself.blog
|
|
| | | The academy is not paradise. But learning is a place where paradise can be created. The classroom with all its limitations remains a location of possibility. In that field of possibility we have the opportunity to labour for freedom, to demand of ourselves and our comrades, an openness of mind and heart that allows us... | ||