|
You are here |
legalinsurrection.com | ||
| | | | |
www.wholetomato.com
|
|
| | | | | Webinar overview: In this webinar, we discuss the latest developments in Visual Assist with a focus on the latest release. Get an inside look at what the developers added for VA 2024.1 and what you can expect to be added to the toolset in the upcoming months. . The Visual Assist team showcases the new | |
| | | | |
www.asi.it
|
|
| | | | | The event was hosted in Manama, the capital of the Kingdom of Bahrain, on July 2nd Earth observation, space exploration, space visions, and policies are the focal points of the [...] | |
| | | | |
www.popularmechanics.com
|
|
| | | | | Fuel cell-powered vehicles are stillthe way of the future ... if they can dodge a few big stumbling blocks. | |
| | | | |
www.dlr.de
|
|
| | | On 22 February 2024, the US 'New Space' company Intuitive Machines became the first private company to land on the Moon with its IM-1 Odysseus mission. The landing site is located around 800 kilometres north of the lunar South Pole, east of the Malapert A crater. According to Intuitive Machines, the landing took place just 1500 metres from the intended landing site, meaning that Odysseus is located in the south of the South Pole-Aitken impact basin which measures over 2000 kilometres in diameter. The exact landing coordinates are 80.13 degrees South and 1.44 degrees East. The lander is on a surface at an incline of 12 degrees and topographical height of 2579 metres above the reference 'selenoid' - a modelled 'lunar surface' with identical gravitational pull. | ||