|
You are here |
www.lroc.asu.edu | ||
| | | | |
www.dlr.de
|
|
| | | | | On 22 February 2024, the US 'New Space' company Intuitive Machines became the first private company to land on the Moon with its IM-1 Odysseus mission. The landing site is located around 800 kilometres north of the lunar South Pole, east of the Malapert A crater. According to Intuitive Machines, the landing took place just 1500 metres from the intended landing site, meaning that Odysseus is located in the south of the South Pole-Aitken impact basin which measures over 2000 kilometres in diameter. The exact landing coordinates are 80.13 degrees South and 1.44 degrees East. The lander is on a surface at an incline of 12 degrees and topographical height of 2579 metres above the reference 'selenoid' - a modelled 'lunar surface' with identical gravitational pull. | |
| | | | |
lroc.sese.asu.edu
|
|
| | | | | The Apollo 17 Lunar Module Challenger descent stage comes into focus from the new lower 50-km mapping orbit, image width is 102 meters [NASA/GSFC/Arizona State University]. | |
| | | | |
www.space.com
|
|
| | | | | NASA's Lunar Reconnaissance Orbiter captured new images of the Apollo 11 moon landing site. Space agency officials turned it into a video. | |
| | | | |
www.universetoday.com
|
|
| | | China took a step closer to the Moon, with the first short test for their crewed lunar lander. The test was completed on Wednesday, August 6th at a facility in China's northern Hebei Province, and lasted just under 30 seconds. The tethered test successfully demonstrated the integration and performance of key systems, simulating descent, guidance, control and engine shutdown. This marks the first test for a China's Manned (crewed) Space Agency (CMSA's) human-rated lander. | ||